Practical Management of
The Darling River:
Ten Steps
by Ron Pike
Jan 2019.
The management of the Darling River and its vast catchment must be vested with ONE authority; not six or seven as is the present case. We can for now call it “The Darling River Authority” (DRA).
- The Darling River and its catchment must be removed from the MDB (Murray-Darling Basin) Plan. There never was any need for water from the Darling to be tagged for use in SA. Management of flows in the lower Murray can come from much larger and more reliable sources.
- The DRA must be legally bound to manage the water in the Darling system on the following basis.
- First priority for available water every year is maintenance of all of river flow in sufficient volume to supply all stock and domestic needs along with all Municipal requirements.In managing the quantum to be held in storage to meet this First Priority, at least two years supply of water must be accounted for in upstream storages, including delivery losses.
Continue reading “Practical Management of The Darling River: Ten Steps”